DIKAPABED

B2B Sourcing Strategy

Your second
supplier,
ready.

Reduce single-source risk with a factory that can align to your existing specification, match your quality benchmark, and grow share as confidence builds.

Lead time 30 / 45 days
Trade term FOB · Your forwarder
Container Mixed 40HQ
Compliance UK · EU ready
Quality upholstered bed in a contemporary bedroom setting
Positioning Second supplier → preferred partner
Specification Aligned to your brief
Sample to bulk Confirmed per order
Batch consistency Tracked & documented
MOQ Flexible first order
Inspection Pre-shipment standard
Specification Alignment Upholstered bed frame detail showing fabric and construction quality

Why a second supplier matters

Resilience is a sourcing decision, not a contingency plan.

A second supplier is most valuable when it can actually match what you already sell -- the same specification, the same quality level, the same commercial conditions. We approach second-supplier relationships with a clear process: align first, then prove it through sampling and a controlled first order.

✓
Specification alignment before quoting We review your existing model, material and packing requirements before pricing -- not after.
✓
Sample-to-bulk traceability Approved samples are retained as the production reference for every subsequent order.
✓
No disruption to your primary supply A trial order can run alongside your existing supplier without commitment to full transfer.
✓
Documented conditions from day one Price basis, MOQ, lead time, compliance and packing are confirmed in writing before production.

What we align on

Six areas that determine whether a second supplier actually works.

Each area is confirmed before production begins. Gaps are flagged during the alignment review, not discovered after the container arrives.

Fabric and upholstery detail on a bed frame
01 · Specification

Matching your existing brief

Model, size programme, material, construction and packing are reviewed against your current specification before a price is issued.

Sample fabric swatches and quality review materials
02 · Sample consistency

Sample to bulk, controlled

Approved samples are photographed, documented and retained as the production reference. Pre-shipment inspection checks against the same record.

Container loading and logistics preparation
03 · Pricing conditions

Comparable, transparent basis

Unit price, MOQ, loading quantity, lead time and trade term are confirmed in the quotation. No hidden adjustments at the PI stage.

Bed frame construction and assembly quality
04 · Batch consistency

Repeat orders match the reference

Material, colour, dimension and packing records are retained per confirmed order. Deviations are reported before shipment, not after.

Quality control and inspection process
05 · Compliance

Documentation for your market

UK fire regulations, EU GPSR, REACH formaldehyde and relevant test reports are reviewed per product and destination before the first order.

Upholstered storage bed showing packing and logistics readiness
06 · Container & loading

Loading plan from the first order

20GP and 40HQ quantities are confirmed per model and size. Mixed-container planning is available subject to loading review.

Alignment process

How we match your current specification.

We do not ask you to start from a blank brief. You share what you currently sell -- we confirm what we can match, what needs review, and what conditions apply.

01
Share your existing model or reference Product photos, current spec sheet, or a competitor reference are all workable starting points. We confirm what we can align to directly.
02
Material and construction review Frame material, fabric family, foam density, slat system, gas lift mechanism and packing method are each confirmed against your current product.
03
Pricing on a comparable basis The quotation reflects the same specification scope -- not a stripped-down version. If a cost difference exists, the source is identified clearly.
04
Gaps flagged before sampling Any area where our standard differs from your current product is raised during the alignment review, before sample cost or lead time is committed.
05
Written confirmation before production Specification, price, MOQ, lead time, compliance scope and packing are all confirmed in writing via PI before any production begins.
Factory production line showing bed frame construction and quality control
Material confirmed Construction matched Packing reviewed

Trial order path

Five steps from brief to first shipment.

A trial order does not require a full supplier transfer. It is a controlled first shipment with a defined scope, documented approval at each stage.

01

Share your brief

Current model, target market, size programme, approximate quantity, and any specification requirements you want to maintain.

02

Alignment review

We confirm what matches directly, what needs configuration, and what compliance documentation applies to your destination market.

03

Quotation & sample

Price, MOQ, lead time and packing confirmed in writing. Sample produced against the agreed specification for your approval.

04

PI & production

Final order confirmation issued after sample approval. Production begins on deposit receipt with pre-shipment inspection scheduled.

05

Inspection & shipment

Pre-shipment inspection against approved sample. Inspection report, photos and shipping documents provided before balance payment.

Sample to bulk & batch consistency

What you approve is what you receive -- and what every repeat order references.

Upholstered bed sample showing fabric, stitching and construction detail

Approved sample as production reference

Fabric article, colour code, dimensions and hardware are documented and retained after sample approval.

01 · Sample approval

Every detail recorded at approval stage

Fabric swatch, colour reference, construction photos and dimension measurements are documented when you approve the sample. This record travels with every subsequent production order.

02 · Pre-shipment inspection

Checked against the approval record

Pre-shipment inspection compares finished goods against the approved sample record -- fabric, colour, construction, assembly, packing and labelling. Deviations are reported before loading.

100% Orders inspected pre-shipment
3rd Party inspection available on request
03 · Repeat order continuity

Batch records retained per order

Material, colour and construction records are retained per confirmed shipment. Repeat orders reference the same approval record, reducing batch-to-batch variation risk across your range.

Compliance documentation

Market-ready documentation, confirmed before the first order.

Compliance requirements vary by product, material and destination. We review what applies to your specific market before quoting -- not after the goods are produced.

🇬🇧

UK market

Furniture and Furnishings (Fire) (Safety) Regulations and BS 7177 reviewed per upholstered product. Relevant test reports confirmed before production.

Fire · Safety · BS 7177
🇪🇺

EU market

GPSR, REACH formaldehyde (0.062 mg/m³ from August 2026) and EUDR timber traceability reviewed per product and material. DPP readiness tracked.

GPSR · REACH · EUDR
📋

Test reports & documentation

Existing test reports, certificates and material declarations are provided per product. Third-party testing can be arranged for new specifications.

Test reports · Certificates
Compliance is confirmed per product, market and material -- not assumed.

Share your destination market and product type. We will confirm what documentation exists, what may need updating, and what applies to your specific order before a quotation is issued.

Discuss compliance ↗
Container loading plan showing bed frames packed for export
40HQ Primary container type

Container & loading

Loading efficiency affects your landed cost -- not just your freight bill.

Container quantities are confirmed per model and size before quoting. Mixed-container planning -- beds, mattresses, multiple models -- is available subject to a loading review.

40HQ Primary container type for upholstered beds and mattresses
Mixed Beds + mattresses in one container, subject to loading plan
KD Knock-down packing increases loading quantity for most models
FOB Your forwarder. EXW or CIF available on request.

Loading quantities depend on model dimensions, packing method and assortment mix. Final figures are confirmed in the quotation -- not estimated from a general catalogue.

Growing the relationship

From trial order to preferred partner.

Share expansion follows demonstrated performance -- not promises. Each stage is based on evidence from the previous order, not a sales target.

Start the conversation ↗
1
Trial order: one model, controlled scope Begin with a single model or a small SKU set. Specification, sample, inspection and shipment are documented end to end. No commitment to full transfer required.
2
Review: quality, packing, delivery, feedback After the first shipment, we review quality, packing performance, delivery accuracy and any market feedback together. Issues are addressed before the next order.
3
Expand SKU range or increase volume Once the first order is proven, additional models, sizes or colours can be added. Volume-based MOQ and pricing conditions can be reviewed at this stage.
4
Flexible commercial conditions as share grows Payment terms, MOQ flexibility and mixed-container planning are reviewed as the relationship develops and repeat purchasing is established.
5
Preferred supplier: stable, continuous container programme The goal is a stable, ongoing container programme with predictable lead times, consistent quality, and a responsive account contact from inquiry to shipment.

Products for second-supplier programmes

Validated models, ready for specification review.

View all products ↗
Twin-Cushion Curved Gas Lift Storage Bed Sample Developed

Twin-Cushion Curved Gas Lift Storage Bed

For retailers looking for a softer storage-bed silhouette, the twin-cushion headboard and curved profile create a relaxed look...

SA-03 MOQ: 50 Sets 30 Days Standard · 45 Days Custom Bed Frames
View specification ↗
Rounded Headboard Gas Lift Storage Bed Sample Developed

Rounded Headboard Gas Lift Storage Bed

Use the rounded headboard to add a softer contemporary direction to a gas-lift storage-bed range.

LB-154 MOQ: 50 Sets 30 Days Standard · 45 Days Custom Bed Frames
View specification ↗
Tall Winged Upholstered Bed Frame Sample Developed

Tall Winged Upholstered Bed Frame

Use the tall winged headboard to create a stronger upholstered-bed statement with practical gas-lift under-bed storage. Two common...

UF-11 MOQ: 50 Sets 30 Days Standard · 45 Days Custom Bed Frames
View specification ↗
Double-Sided Hybrid Mattress Sample Developed

Double-Sided Hybrid Mattress

Build a roll-packed hybrid mattress range around a double-sided comfort concept with a 16 cm pocket-spring core.

LYM-26 MOQ: 40 pcs 30 Days Standard · 45 Days Custom Hybrid Mattresses
View specification ↗
Cooling Extra-Firm Hybrid Mattress Sample Developed

Cooling Extra-Firm Hybrid Mattress

Build a UK-oriented hybrid mattress offer around a clearly defined extra-firm construction rather than a generic spring label.

LTM-85 MOQ: 40 pcs 30 Days Standard · 45 Days Custom Hybrid Mattresses
View specification ↗

Adjacent sourcing resources

Further reading for buyers building a sourcing programme.

Sourcing Service

How We Control Your Order From Approval to Shipment

A clearer B2B buying processFrom product brief to shipment, know what happens next.See how we confirm bed frame and mattress requirements, review...

Read guide ↗
Sourcing Service

How to Plan the Right Product Mix for Your First Container

Buying Guide Container Planning B2B Import First container SKU planning Plan yourfirst containerwith precision. A structured approach to selecting market, sizes, colours,...

Read guide ↗
Sourcing Service

What Online Furniture Retailers Should Confirm Before Ordering Beds

E-Commerce & DTC Supply Chain Solutions Beds Engineered for Parcel Delivery, Quick Assembly & Zero-Return Growth. Eliminate oversized freight penalties and assembly-related...

Read guide ↗

Start the conversation

Ready to review what a second supplier relationship looks like for your range?

Share your current product, market and approximate volume. We will confirm what we can align to, what the conditions look like, and what a trial order path would involve -- without any obligation to transfer your full supply.

FOB · Your forwarder · Mixed container available · UK & EU compliance reviewed