DIKAPABED
B2B Production & Supply Chain Integrity

How We Control Your Order From Approval to Shipment

From finalized spec sheets and signed golden swatches to rigorous staged QC, export-grade packaging, and container stowage--we ensure what you approved is exactly what arrives at your warehouse.

Explore 5-Stage Control
Final Order Confirmation (FOC) Sign-off Staged In-line & Pre-shipment QC Container Loading Supervision
Furniture manufacturing and QA quality control inspection
Standard Operating Procedure
Strict Production Gate

Zero mass-production starts prior to deposit confirmation, fabric batch matching, and BOM dimensional sign-off.

Standard Production 30 Days From confirmed deposit & FOC
Custom / OEM-ODM 45 Days Full sample & structural test
Inspection Protocol 100% Pre-pack Trial assembly & hardware check
Container Dispatch FOB Export Photo/video verified loading
Five-Gate Discipline

From Reference to Repeat Order

Every order follows a sequential gate verification. No phase commences until its upstream checklist is formally approved.

01 Gate 1

Requirement & Feasibility

Target market matching (UK/EU sizes), channel demands (ecommerce KD vs brick-and-mortar), fabric swatches, and bed base / slat feasibility review.

• Commercial alignment
02 Gate 2

Final Spec Confirmation

Proforma Invoice issuance, deposit receipt, and Final Order Confirmation (FOC): locking fabric codes, E1/E0 boards, gas lift N-ratings, carton drops, and artwork.

• Deposit & BOM lock
03 Gate 3

In-Line Production

Metal frame laser cutting, welding, powder coating, foam density (25D/30D/35D) validation, precision upholstery sewing, and pocket spring coil tempering.

• Staged workmanship
04 Gate 4

Trial Assembly & QA

Pre-pack random pull out: hole alignment checks, gas lift smooth operation cycle test, hardware bag weighting, and comprehensive photo/video inspection dossier.

• Inspection Dossier
05 Gate 5

Loading & Release

Calculated 40HQ container packing layout, moisture checks, container loading supervision, bill of lading issuance, balance settlement, and telex release.

• Safe cargo handover
Standard Quality Checkpoints

How We Inspect: Bed Frames vs. Mattresses

Both product lines follow dedicated test parameters before packing cartons or compression bags are sealed.

Structural & Cosmetic Precision for Bed Frames

We verify all critical failure points before container loading, preventing end-consumer returns and assembly frustrations.

1. Mechanical & Slat System

Gas lift hydraulic pressure, opening angles, curved birch/poplar slat flexing, and central metal beam support.

2. Hardware Bag Weight Scale

Every hardware kit is digitally weighed against master counts to eliminate missing screw or bracket complaints.

3. Upholstery & Seam Tension

Batch swatch color variance, corner piping straightness, foam rebound, and pull-test on buttons/tufting.

4. Board Standards (E1/E0)

E1-grade plywood and E0 particleboard verification, ensuring structural integrity and formaldehyde emission compliance.

Bed frame assembly and component verification
Pre-Shipment Trial

1-2 sets from each batch are fully built to verify instruction clarity and hole tolerance.

Damage Prevention & Logistics

Packaging Engineered for E-Commerce & Ocean Logistics

A low FOB price is worthless if products arrive damaged. We optimize carton profiles, corner shock absorption, and mixed container layouts to maximize load efficiency while minimizing transit damage.

1
5-Layer Mail-Order Cartons Heavy-duty corrugated walls with high-density EPS edge guards to endure 3PL courier drops.
2
Smart KD (Knock-Down) Volume Reduction Upholstered storage beds packed in 2 boxes (or compact 1-box metal designs) to maximize 40HQ stuffing volume.
3
Mixed Container Stowing Calculation Pre-calculated 3D loading plans combining beds and compressed mattresses to avoid empty container space.

Live Loading Checklist

100% Verified
  • Container structural cleanliness & smell inspection prior to stuffing
  • Desiccant packs positioned to prevent condensation / container rain
  • Heavy flat packs at base, roll-packed mattresses strapped securely on top
  • Full photo report: Empty floor → Half loaded → Full → Door closed → Seal lock
FOB Document Release: Original B/L or Telex Release is delivered immediately upon balance confirmation following inspection sign-off.
Commercial Assurance

Process & QC FAQ

Common questions regarding sampling, mixed containers, third-party audits, and warranty claims.

Can we arrange a 3rd-party inspection (e.g., SGS, Intertek, QIMA)? +
Yes, absolutely. We welcome third-party QC inspectors appointed by clients. We coordinate inspection schedules at our factory 2-3 days prior to the agreed container loading date.
How do you handle replacement parts or shipping damage? +
We provide free spare parts (gas lifts, slat plastic caps, corner brackets, and screws) packed into every container. For verifiable transit or manufacturing defects, we credit or replace items in the subsequent shipment based on photos and carton serial numbers.
Can we mix different models, sizes, and mattresses in one 40HQ container? +
Yes. We regularly assemble mixed containers (e.g., 2-3 bed frame models across 2 colors + 1 pocket spring mattress SKU). Each SKU must meet its batch production minimums, and our engineers calculate the optimal 3D cubic fill.
What is the standard payment and production milestone schedule? +
Standard commercial terms are 30% T/T deposit upon Proforma Invoice & FOC sign-off to begin raw material cutting. The remaining 70% balance is settled against inspection sign-off and copy of the Bill of Lading (B/L draft).
Get Your Project Started

Ready to Build a Reliable OEM/ODM Supply Chain?

Let's review your target market models, carton requirements, and loading plans. Receive a technical quotation with confirmed lead times and QA safeguards.

Direct factory response within 24 business hours • Strict IP confidentiality • No obligation